SSC Pedestrian Bridge

The bridge demolition began on February 24, 2021 and has been completed.  A new concrete ramp to the cafeteria entrance for ADA access was completed.  There are Safety measures in place by installation of safety fencing and providing protective barriers.  Signage has been installed to direct pedestrian traffic safely through the area.  Currently work is on hold as the Steel Design and fabrication phase of the project has begun. The project will restart in mid-June when the steel arrives and the SSC Pedestrian Bridge is scheduled to be completed by mid-August 2021.

SSC Pedestrian Bridge Project

  • SSC Bridge Demolition
  • SSC Bridge Demolition – March 04, 2021
  • SSC Bridge Demolition    March 04, 2021
  • SSC Bridge Demolition    March 08, 2021
  • SSC Bridge Demolition
  • SSC Bridge Demolition - March 25, 2021